Showing posts with label Monthly Accounting. Show all posts
Showing posts with label Monthly Accounting. Show all posts

Tuesday, February 1, 2011

Monthly Accounting and a Word About Batting




So, it's been a long time since I've made a list like this. I'm glad to say that most of the items from my last monthly accounting are truly finished, although one still sits waiting to be quilted.

Quilts tops that need basting, quilting and finishing:

Chocolate Covered Cherries (shown with its red backing fabric)

Sherwood Forest Romance

Briners' Picnic (yes, still)


WIPS that need piecing:

Hunter's Star (I pieced together the blocks I'd made and I love it but it needs to be bigger.

Green and white chain quilt (chain blocks are made, I need to cut the white blocks and piece them together)


It's not as big a list as usual. Maybe I've gotten better at narrowing my focus? I have other unfinished things that have been in a holding pattern for a while. But since I have no plan for them they don't make the list. Obviously there's a lot of quilting in my future.

I have the batting and backing for Chocolate Covered Cherries and Briners' Picnic so there's no reason I couldn't get serious about layering them this month. When I get the chain quilt pieced its going to make it to the top of the list since I"m making it as a gift for a friend. I don't know yet how big it's going to finish. Once I know for sure I'll be ordering the battings I need. I used a wool batting in Flying Rose and I love it! It's more expensive than the Hobbs Heirloom 80/20 which is what I have been using for the past several years but wool is LOVELY to work with and the finished quilt feels wonderful. As hubby says, $20 more per batting is a really a small fraction of the cost of the quilt. Sometimes I really love how he thinks

Thursday, October 1, 2009

Monthly Accounting: October

Alright so I've already confessed that I wasn't sewing much over the summer. (As in, if it it didn't need binding or a hanging sleeve for the show, I didn't even think about doing it.) So I have a few projects that are still in UFO status and a few more that I've started since the show ended:

Quilt tops that need basting, quilting and finishing:

Ramblin' Rose
Briners' Picnic
Ties That Bind


Quilt tops that need piecing:

Hunter's Star (A few blocks made, end size unknown)
Vanilla Quilt (Three blocks made, end size unknown)
Flowers (Piecing nearly finished, just three more sections to go)


Other projects:

Apron (pieces cut, but I need to transfer marks from pattern to fabric and do the sewing.)


Surrender:
I have given up on the applique center that I was making for last year's Piecemakers exchange quilt. I was really unhappy with how it was turning out, and every time I picked it up I told everyone who was within earshot, "I hate this piece". It was time to let it go. So I'd like to work out some other arrangment of the blocks and move on, but it's not high on my list of priorities.

Sunday, February 1, 2009

Monthly Accounting: February

Aren't you proud of me? For several months running I have managed to report to you about my progress for the month. Well. I'm proud of me, at any rate. I was thinking a monthly feature might REALLY stretch my ability to commit to blogging, but it's actually been a great motivator, both for sewing and for blogging.

Finished:
- 2 tables runners which were actually Christmas gifts, I didn't get to finish them, so I pieced them and presented them as gifts. (My dear friends opened their boxes, laughed with me and graciously handed them back so I could finish them!)

Made Progress:
-Quilted "Princeton Plainsboro" (2007 Piecemaker's house quilt project)
-1 table runner
-Continued to stitch on blackwork blocks, but won't be done anytime soon!
-Went on retreat and pieced center of "Mystery in the Mountains", it needs two borders
-Frogged non-working sashing on "Ramblin' Rose" and started over, blocks now pieced together in a happy arrangement. One border finished this weekend. Final border to go.

Left Untouched:
-Sandwich, quilt and bind "Briner's Picnic"
-Applique center for 2008 Piecemakers' exchange quilt


In February:
-Finish that remaining table runner
-Finish piecing the top for "Ramblin' Rose"
-Bind and make a few little adjustments to "Tropical Storm".
-Bind "Princeton Plainsboro"
-Get started on Piecemaker's 2009 exchange blocks

Saturday, January 3, 2009

Monthly Accounting

Kay opening "Blush and Bashful" on Christmas morning:


December accounting:

Completions:
-Four Owl Pincushions
-Seven "Tote Along" Grocery Bags
-Binding for "Blush and Bashful"
-Quilted and bound victorian sampler quilt (and shipped to New England, on time)

Made Progress:
-Sandwiched "Princeton Plainsboro" (2007 Piecemaker's house quilt project)
-Continued to applique center for 2008 Piecemakers' exchange quilt
-Made the tops of 3 table runners for Christmas gifts. (My dear friends opened their boxes, laughed with me and graciously handed them back so I could finish them!)
-Continued to stitch on blackwork blocks, but won't be done anytime soon!

Left Untouched:
-Sandwich, quilt and bind "Briner's Picnic"
-Finish piecing the top for "Ramblin' Rose"

In January:
-This weekend I want to get "Ramblin' Rose" pieced together so i can start work designing the border.
-I need to finish quilting the 3 table runners I made as Christmas gifts.
-Bind and make a few little adjustments to "Tropical Storm".
-Quilt and Bind "Princeton Plainsboro" (finally)
-Get started on Piecemaker's 2009 exchange blocks
-My first UFO project has already been selected... more details to come!

Monday, December 1, 2008

Monthly Accounting

Hey what do you know, it's time to make the second installment of monthly accounting.

So how did I do with my goals last month?

Completions:
-Quilt and bind table runner for my sister-in-law as a hostess gift for Thanksgiving

Made Progress:
-Binding for "Blush and Bashful" (Kay's pink and pink glorified 9 patch quilt)
-Sandwich, quilt and bind "Princeton Plainsboro" (2007 Piecemaker's house quilt project)
-Make applique center for 2008 Piecemakers' exchange quilt
-Finish piecing the top for "Ramblin' Rose"
-Finish blackwork blocks by the end of 2008.

Left Untouched:
-Sandwich, quilt and bind "Briner's Picnic"
-Finish quilting Victorian sampler quilt for my sister's Christmas gift.

New items to put on my list for December:
2 pin cushions for the ECQG exchange
3 placemats/tablerunner sets for gifts
6 grocery sacks for gifts

Sunday, November 2, 2008

Monthly Accounting

It might be optimistic of me to start a monthly feature, considering my erratic posting habit, and yet I want to try. I have made some great headway in the past couple of weeks and I am setting some goals for the next few weeks that I would like to share with you.

Hello, my name is Danielle, and I'm a UFO maker.

UFOs That I Have A Plan to Complete:
-Binding for "Blush and Bashful" (Kay's pink and pink glorified 9 patch quilt)
-Sandwich, quilt and bind "Princeton Plainsboro" (2007 Piecemaker's house quilt project)
-Quilt and bind table runner for my sister-in-law as a hostess gift for Thanksgiving
-Make applique center for 2008 Piecemakers' exchange quilt
-Sandwich, quilt and bind "Briner's Picnic"
-Finish piecing the top for "Ramblin' Rose"
-Finish quilting victorian sampler quilt for my sister's Christmas gift.
-FInish blackwork blocks by the end of 2008.

UFOs For Which I Have No Plan, But Desire to Finish:
-Determine setting for stack and whack blocks
-Determine if I'm going to pull out the pieces of "Crossroads" that make me crazy, or quilt it as is.
-Determine if I'm going to quilt my snowman tablerunner as is, or take it apart and do something different with it.
-Determine layout for "Hearts and Friendship" blocks.

Finally, for the first time ever, I am going to pay someone else to quilt something for me. Years ago hubby and I took a class together and his resulting quilt is king sized, and the background is Kona cotton. This poor quilt top has been languishing for years waiting for someone to quilt it, but it is too big and heavy for me to do personally. I have reserved a space in Melinda's schedule to get it done for Christmas, the backing is ready and the batting (black cotton wasn't available locally) should be in tomorrow or the next day.